Environmental Documents
Please contact Environmental Services if you require additional information at (760) 398-2651.

-
2017/18 Non-Potable Water Connections Project
The 2017/18 Non-Potable Water Connections Project involves the construction and operation of four Non-Potable Water (NPW) connections that would be used to provide irrigation water for six local golf courses, one RV resort, and one planned golf course facility, towards the goal of expanding the use of recycled water within CVWD’s jurisdiction. The golf courses currently use onsite groundwater or CVWD-supplied potable water for irrigation. The proposed project would deliver a blend of tertiary treated water from CVWD’s existing Water Reclamation Plant No. 10 (WRP10) facility and Colorado River water from the Mid-Valley Pipeline.
Link to page -
Eastern Coachella Valley Stormwater Master Plan
The Eastern Coachella Valley Stormwater Master Plan Project (Master Plan) is designed as a long-term, comprehensive stormwater master plan that identifies conceptual locations, alignments, and sizes for primary stormwater facilities within the 167 square mile Study Area. The Master Plan is a planning guide for locating and sizing regional stormwater and drainage facilities (Facilities). It is anticipated these Facilities will be constructed by CVWD and/or others over time as continued urban development takes place within the area. The Master Plan has been designed to be inherently flexible to allow CVWD to respond to changed physical, environmental, regulatory, and economic conditions.
Link to page -
Highway 86 Domestic Water Transmission Main
The Highway 86 Domestic Water Transmission Main project involves the installation, operation, and maintenance of a domestic water pipeline that would supply water to the communities of Salton Sea Beach, Desert Shores, Salton City and unincorporated areas in Riverside and Imperial Counties.
Link to page -
Palm Desert Groundwater Replenishment Project
The Palm Desert Groundwater Replenishment Project involves repurposing existing percolation ponds located north of CVWD’s Water Reclamation Plant No. 10 (WRP1O) and constructing detention basins within the Whitewater River Stormwater Channel south of WRP1O for the purpose of replenishing the groundwater basin using Colorado River water.
Link to page -
Thousand Palms Flood Control Project
In order to comply with both the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), CVWD and the United States Army Corps of Engineers (USACE) will prepare a joint Environmental Impact Report & Environmental Impact Statement (EIR/EIS) for the Thousand Palms Flood Control Project proposed by CVWD.
Link to page