Search Results

1 - 10 of 2158 results (0.13 seconds)

http://www.cvwd.org/documentcenter/view/3130

: Section 1 – Introduction. This chapter provides an introduction and summarizes CEQA requirements for preparation of responses to substantive public comments on the Draft EIR. Introduction to the Final EIR Coachella Valley Water District 1.2 Final EIR Chromium-6 Water Treatment

1 MB

http://www.cvwd.org/documentcenter/view/2989

Section 4.13 Noise Coachella Valley Water District 4.13-1 Draft EIR Chromium-6 Water Treatment Facilities Project April 2016 4.13 NOISE AND VIBRATION 4.13.1 INTRODUCTION This section describes and analyzes the current noise environment in the areas where project facilities

848 KB

http://www.cvwd.org/documentcenter/view/2988

Section 4.12 Mineral and Energy Resources Coachella Valley Water District 4.12-1 Draft EIR Chromium-6 Water Treatment Facilities Project April 2016 4.12 MINERAL AND ENERGY RESOURCES 4.12.1 INTRODUCTION This section describes the availability of mineral and energy resources

241 KB

4.6 Cultural Resources

Apr 14, 2016
http://www.cvwd.org/documentcenter/view/3006

Section 4.6 Cultural Resources Coachella Valley Water District 4.6-1 Draft EIR Chromium-6 Water Treatment Facilities Project April 2016 4.6 CULTURAL RESOURCES 4.6.1 INTRODUCTION This section evaluates the potential for implementation of the proposed project to result

991 KB

http://www.cvwd.org/documentcenter/view/1020

Page 1 of 2 (Rev 7/22/13) COACHELLA VALLEY WATER DISTRICT GENERAL NOTES FOR DRAINAGE SYSTEMS UNLESS NOTED OTHERWISE, THE WORK SHOWN ON THESE PLANS SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT EDITION OF THE FOLLOWING STANDARD SPECIFICATIONS: 1. STANDARD SPECIFICATIONS

17 KB

http://www.cvwd.org/documentcenter/view/2210

Proposed sewer rate adjustments for businesses (2015 proposal) Coachella Valley Water District (CVWD) is considering restructuring its sewer rates in a way that will result in an increase for most customers and a decrease for others, effective July 1, 2015. Nominal rate increases are also

110 KB

http://www.cvwd.org/documentcenter/view/3567

district (cVwd) board of directors will conduct a public hearing to consider a proposed restructure of rates and charges for sewer service provided to all customers. If approved by the CVWD Board of Directors, the new structure will take effect on January 1, 2018. some residential customers

6 MB

http://www.cvwd.org/documentcenter/view/3001

Section 4.1 Overview Coachella Valley Water District 4.1-1 Draft EIR Chromium-6 Water Treatment Facilities Project April 2016 4. ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION MEASURES 4.1 OVERVIEW This chapter provides a project-level analysis of the physical environmental effects

105 KB

http://www.cvwd.org/documentcenter/view/1027

Page 1 of 9 Guideline K-3 (Rev 7/9/13) COACHELLA VALLEY WATER DISTRICT GUIDELINE K-3 SCOUR CALCULATION GUIDANCE K-3.1 General Requirements The calculation of scour will be required for the design of flood control channels with erodible beds and for structures proposed

180 KB

http://www.cvwd.org/documentcenter/view/1024

Page 1 of 1 ENG AG-009 (Rev 7/5/13) COACHELLA VALLEY WATER DISTRICT FARM DRAIN TILE TABLE Table No. 1 No. Acres Q in Sec-Feet No. Acres Q in Sec-Feet 1 40 0.4 Q 0 .0 05 p er A cr e 25 1000 5.0 Q 0 .0 02 5 p er A cr e 2 80 0.7 30 1200 5.5 3

16 KB

12345...216

Show  per page